2 million cubic meters digging and 900,000 cubic meters of backfilling and concrete 155 thousand cubic meters of concrete tunnel with a length of 6900 meters with a dimension of 5.2 and a height of 5 meters.
Power News, Adel El Bahnasawy
The power News website monitors pictures of a national epic dole out by Hassan Allam Construction Company, one of the sons of Allam group, the world leader in large projects in building and construction of service tunnels within the new administrative capital, and over the amount of completion of the project, the Minister of Electricity and also the leaders of the Capital Company and the advisor Shaker group attended the civil construction work of the tunnel body The Minister of Electricity and the business firm was impressed with the performance of Hassan Allam you’ll be able to imagine how the corporate accomplished the tunnel that the Prime Minister and a number of ministers visited yesterday and admired his designs, its implementation work, and also the cable installation work carried out by Al-Sewedy Cables.
You can imagine that Allam drilled 2 million cubical meters and 900,000 cubical meters of backfill, concrete 155 thousand cubical meters, a tunnel with a length of 6,900 meters, a breadth of 5.2 and a height of 5 meters.
The subsequent are detailed information for the project:* Project: Tunnel works for ministries’ area within the new administrative capital, “Tunnel 3”
* Owner: New Urban Communities Authority *New administrative General advisor: 5UDC
* Supervisor Consultant: Shaker Engineering Consultant
* The executing company as HA Construction Company
* Project location: the new administrative capital – Ministries area.
* Project description: The tunnel implementation works include “free and construction of the tunnel body, external insulation and backfilling” for a tunnel with a length of 6970 meters. the trail has been divided into 244 implementation and scope sections for the works that embrace the following: drilling, substitution associated leveling – construction of the concrete tunnel body – external insulation of the tunnel – backfilling round the tunnel – digging on the tunnel with an approximate quantity of 2 million M3 – Backfilling with an approximate quantity of 900,000 M3 – reinforced concrete 155 m3
The project was divided into 244 elements, with associate approximate length of 30 m for each half. the whole works of the tunnel were executed, apart from backfilling on each side of the tunnel and above the surface of the tunnel.